Commercial Roof Replacement Process

Initial Assessment

Conduct a thorough inspection to evaluate the roof's condition and identify specific issues.


Planning and Permits

Develop a detailed plan, select appropriate materials, and secure necessary permits.


Preparation

Protect the building's interior and surrounding areas with tarps and safety barriers.


Remove rooftop equipment or relocate if necessary.

Tear-Off

- Remove old roofing materials, including membranes, insulation, and debris.

- Dispose of waste in compliance with local regulations.


Deck Inspection and Repairs

Examine the roof deck for damage, replacing or reinforcing sections as needed.


Install Underlayment

Apply a waterproof and weather-resistant underlayment to protect the roof deck.


Insulation Installation

Install insulation to improve energy efficiency and meet industry standards.


New Roofing System Installation

Lay out and secure the selected roofing material, such as single-ply membranes, metal panels, or built-up roofing (BUR).

Overlap seams and seal edges for watertight protection.


Flashing and Edge Sealing

Install flashing around penetrations, edges, and seams for additional waterproofing.


Final Inspection

Ensure proper installation, alignment, and adherence to safety standards.


Cleanup

Remove all debris, tools, and protective materials, leaving the site clean and safe.


Post-Project Review

Conduct a walkthrough with the client to explain the completed work and provide maintenance tips.